Production Planning Problem Under Uncertainty

CHF 65.40
Auf Lager
SKU
HQ202RH1EGV
Stock 1 Verfügbar
Free Shipping Kostenloser Versand
Geliefert zwischen Mi., 08.10.2025 und Do., 09.10.2025

Details

In this book, we developed a new planning problem to minimize the lost demands and thus maximize revenues. For the first time, we construct the production planning problem with interval numbers as uncertainty in both of the objective function and constrain. The book contains five chapters. Chapter I presents a survey on some important concepts of the production planning problem (PPP). Chapter II introduces two different models of PPP under uncertainty. Chapter III presents two different approaches of PPP. Chapter IV propose an optimization model for PPP having uncertain variable coefficients in both of objective function and constraints. Chapter V introduce the summary and conclusions of the book

Autorentext

I was born and raised in Egypt at 29-03-1982.I have one daughter.She is all my life.The author's name is Marwa Sh.Elsayed.I graduated from science faculty at July 2004.I received master degree in mathematics from Al-Azhar University at Oct.2010.I was a lecturer at a King Saud university in Saudi Arabian.Currently,assistant lecturer at Univ.in Egypt

Cart 30 Tage Rückgaberecht
Cart Garantie

Weitere Informationen

  • Allgemeine Informationen
    • Sprache Englisch
    • Gewicht 185g
    • Untertitel Interval Number Programming
    • Autor Marwa Elsayed , Samir Abass
    • Titel Production Planning Problem Under Uncertainty
    • Veröffentlichung 05.09.2012
    • ISBN 3659203742
    • Format Kartonierter Einband
    • EAN 9783659203749
    • Jahr 2012
    • Größe H220mm x B150mm x T7mm
    • Herausgeber LAP LAMBERT Academic Publishing
    • Anzahl Seiten 112
    • GTIN 09783659203749

Bewertungen

Schreiben Sie eine Bewertung
Nur registrierte Benutzer können Bewertungen schreiben. Bitte loggen Sie sich ein oder erstellen Sie ein Konto.