Construction Delay Analysis Techniques

CHF 97.55
Auf Lager
SKU
GK94AUO8R5E
Stock 1 Verfügbar
Geliefert zwischen Di., 20.01.2026 und Mi., 21.01.2026

Details

At the present time, we do not have universally accepted method to precisely determine the construction project delays, their causes or responsibilities. The float ownership is another vague issue and deserves up front assignment, because it can affect the project time and risk as a result of float consumption by the owner and the contractor(s). The current Project Management (PM) software is used as a tool only to manage the project time, cost, and resources without the ability to determine the project delay, acceleration, or float consumption responsibilities that frequently cause the construction projects ending up in litigations. This Book has investigated the delay analysis techniques, and attempted to solve all of the identified weaknesses in analyzing the float ownership and consumption, acceleration impacts, and the effect of concurrent delays. In addition, it studies the current PM software in analyzing delay claim. Finally, a computer programming is introduced to use in analyzing delay claim. If you would like to understand and study the delay analysis techniques in depth, this is the right book to choose.

Autorentext

Khalid got his Bachelor and Master deg. in Civil Eng. from King Saud University (KSU), Saudi Arabia. He received his PhD deg. in Civil Eng. from SUNY at Buffalo, USA. He participated in managing several Saudi Construction Projects. He is currently Assistant Professor at KSU and Adjunct Assistant Professor at Missouri University for S&T.

Weitere Informationen

  • Allgemeine Informationen
    • Sprache Englisch
    • Anzahl Seiten 324
    • Herausgeber LAP LAMBERT Academic Publishing
    • Gewicht 500g
    • Untertitel Technique Comparison, Float Analysis, and IT Solution
    • Autor Khalid S. Al-Gahtani
    • Titel Construction Delay Analysis Techniques
    • Veröffentlichung 13.12.2010
    • ISBN 3843350701
    • Format Kartonierter Einband
    • EAN 9783843350709
    • Jahr 2010
    • Größe H220mm x B150mm x T21mm
    • GTIN 09783843350709

Bewertungen

Schreiben Sie eine Bewertung
Nur registrierte Benutzer können Bewertungen schreiben. Bitte loggen Sie sich ein oder erstellen Sie ein Konto.
Made with ♥ in Switzerland | ©2025 Avento by Gametime AG
Gametime AG | Hohlstrasse 216 | 8004 Zürich | Schweiz | UID: CHE-112.967.470