Construction Regulations and Seismic Design Criteria of Subway Tunnel
Details
Construction of a tunnel is made by successive operations which must be good connected: striking down, mucking out, temporary supporting, final covering, finishing. The performance of a tunnel basically depends on the ground nature, underground condition, and overburden load. For economic reasons, transportation, communications and others purposes tunnel is boring with the largest section (full-face boring, boring with the shield, boring with the tunnel constraction such as TBM, NATM and Cut & Cover methods).The development in urban areas can be included the construction of shallow tunnels in soft or hard soils and rocks. The construction of tunnels in shallow depth causes the ground to displace. Monitoring in the before and after construction the project are used for controlling the stability of structures. In all methods of tunneling the maximum amount of the rock mass overburden loads are loaded and the distribution of forces are exit from the first condition, with having knowledge on the rock physical parameters can help to the tunnel designers.
Autorentext
Vahed Ghiasi was born in Nahavand town, West Iran in 1977.In 2003the author was responsible of Geotechnical testing of all 11 lineof Tehran Metro project.He completed his B.Sc (Hons) degree in2003 and MSc 2005 and PhD 2011. The author joined the Tehranurban and suburban Railway Company as a Tunnel supervisor in 1998and Malayer University 2011.
Weitere Informationen
- Allgemeine Informationen
- Sprache Englisch
- Gewicht 191g
- Untertitel Construction Regulations with Focusing on Seismic Design Criteria of Metro Tunnel
- Autor Vahed Ghiasi
- Titel Construction Regulations and Seismic Design Criteria of Subway Tunnel
- Veröffentlichung 14.03.2011
- ISBN 384431900X
- Format Kartonierter Einband
- EAN 9783844319002
- Jahr 2011
- Größe H220mm x B150mm x T7mm
- Herausgeber LAP LAMBERT Academic Publishing
- Anzahl Seiten 116
- GTIN 09783844319002