Method of Construction Projects Risk Assessment

CHF 74.05
Auf Lager
SKU
7RUL3QSJK5O
Stock 1 Verfügbar
Geliefert zwischen Mi., 26.11.2025 und Do., 27.11.2025

Details

MOCRA (Method of Construction Risk Assessment) is an author s original method that is used to a comprehensive risk analysis in construction projects. MOCRA can be described as a hybrid method. Unlike other methods, MOCRA allows its user to allocate risks in the material-financial plans. This substantially increases its utilitarian value because it gives a project manager or a direct contractor the possibility to evaluate the consequences of risk factors occurrence. These consequences relate to time and cost. They are visible for both sub-operations and for the entire project. Using MOCRA it is possible to count time and cost contingency for the project and verify the effectiveness of risk assessment. MOCRA method includes the following novelty elements: 1. Idea of a comprehensive risk assessment 2. Division of risk factors into the ones correlated with cost and the correlated with time. 3. Correlation of risk factors with specific operations in the schedule. 4. Idea of risk allocation in the material-financial plan 5. Validity coefficient of risk assessment. 6. Ability to modify the identification and quantification of risk factors in reference to the validity assessment.

Autorentext

Author is a professor at two EU Academies (WSOWL, UJK) and a member of Construction Projects Engineering Unit at Polish Academy of Sciences. He has practical experience as a Project Manager. His publications are cited on different continents and presented at many of scientific conferences (Hong-Kong, Queensland, Orlando, Washington D.C., others).


Klappentext

MOCRA (Method of Construction Risk Assessment) is an author's original method that is used to a comprehensive risk analysis in construction projects. MOCRA can be described as a hybrid method. Unlike other methods, MOCRA allows its user to allocate risks in the material-financial plans. This substantially increases its utilitarian value because it gives a project manager or a direct contractor the possibility to evaluate the consequences of risk factors occurrence. These consequences relate to time and cost. They are visible for both sub-operations and for the entire project. Using MOCRA it is possible to count time and cost contingency for the project and verify the effectiveness of risk assessment. MOCRA method includes the following novelty elements: 1. Idea of a comprehensive risk assessment 2. Division of risk factors into the ones correlated with cost and the correlated with time. 3. Correlation of risk factors with specific operations in the schedule. 4. Idea of risk allocation in the material-financial plan 5. Validity coefficient of risk assessment. 6. Ability to modify the identification and quantification of risk factors in reference to the validity assessment.

Weitere Informationen

  • Allgemeine Informationen
    • GTIN 09783659174223
    • Auflage Aufl.
    • Sprache Englisch
    • Größe H220mm x B150mm x T9mm
    • Jahr 2012
    • EAN 9783659174223
    • Format Kartonierter Einband (Kt)
    • ISBN 978-3-659-17422-3
    • Titel Method of Construction Projects Risk Assessment
    • Autor Dariusz Skorupka
    • Untertitel Mocra
    • Gewicht 233g
    • Herausgeber LAP Lambert Academic Publishing
    • Anzahl Seiten 144
    • Genre Wirtschaft

Bewertungen

Schreiben Sie eine Bewertung
Nur registrierte Benutzer können Bewertungen schreiben. Bitte loggen Sie sich ein oder erstellen Sie ein Konto.
Made with ♥ in Switzerland | ©2025 Avento by Gametime AG
Gametime AG | Hohlstrasse 216 | 8004 Zürich | Schweiz | UID: CHE-112.967.470