Wir verwenden Cookies und Analyse-Tools, um die Nutzerfreundlichkeit der Internet-Seite zu verbessern und für Marketingzwecke. Wenn Sie fortfahren, diese Seite zu verwenden, nehmen wir an, dass Sie damit einverstanden sind. Zur Datenschutzerklärung.
Simulation of Perimeter Taxiway Operations at DFW Airport
Details
The FAA and the DFW airport had proposed a Perimeter
Taxiway (PT) system to improve runway safety and
reduce runway incursions. The PT is analyzed
utilizing actual flight data from the FAA and
DFW database for 2004. An estimate was made
for air traffic operations in 2010 from the FAA
forecasts. Runway assignment was based on runway use
plan and the standard taxiway route suggested by
ATC. North and South flow was simulated
separately in Visual SIMMOD, for a total of
sixteen simulations to assess the operational
procedures and constraints. Flight track data
for one day in 2001, 2002, 2003, 2004, and 2005 was
obtained to conduct a statistical analysis and
determine the height of aircraft overflying the
proposed centerline of PT during departures and
arrivals. The risk factor was computed to test the
Obstruction Free Zone criteria established by
the FAA for arrivals and departures. The VS Animator
was used to visually track the path of each aircraft
on the airfield. The VS Reporter was used to
assemble results for runway crossing delay, taxiway
travel time, gate assignment, arrival and departure
rate per hour, and airport performance
Autorentext
Dr. Satyamurti, a Civil Engineer has worked with many engineering firms in India, Canada, Jamaica, and the United States. He received his Ph D in May 2007 from the University of Texas at Arlington. Dr. Satyamurti and his wife Girija live in Arlington, Texas. They have two sons who are married and blessed with four grandchildren.
Klappentext
The FAA and the DFW airport had proposed a Perimeter Taxiway (PT) system to improve runway safety and reduce runway incursions. The PT is analyzed utilizing actual flight data from the FAA and DFW database for 2004. An estimate was made for air traffic operations in 2010 from the FAA forecasts. Runway assignment was based on runway use plan and the standard taxiway route suggested by ATC. North and South flow was simulated separately in Visual SIMMOD, for a total of sixteen simulations to assess the operational procedures and constraints. Flight track data for one day in 2001, 2002, 2003, 2004, and 2005 was obtained to conduct a statistical analysis and determine the height of aircraft overflying the proposed centerline of PT during departures and arrivals. The risk factor was computed to test the Obstruction Free Zone criteria established by the FAA for arrivals and departures. The VS Animator was used to visually track the path of each aircraft on the airfield. The VS Reporter was used to assemble results for runway crossing delay, taxiway travel time, gate assignment, arrival and departure rate per hour, and airport performance
Weitere Informationen
- Allgemeine Informationen
- GTIN 09783639097641
- Genre Technik
- Sprache Englisch
- Anzahl Seiten 348
- Herausgeber VDM Verlag Dr. Müller e.K.
- Größe H18mm x B220mm x T150mm
- Jahr 2013
- EAN 9783639097641
- Format Kartonierter Einband (Kt)
- ISBN 978-3-639-09764-1
- Titel Simulation of Perimeter Taxiway Operations at DFW Airport
- Autor Saty Satyamurti
- Untertitel A Critical Evaluation of Perimeter Taxiway Operations at DFW International Airport in 2010 Using Visual SIMMOD
- Gewicht 478g