Assessment of the Operations of Osogbo-Akure 132 kV Transmission Line

CHF 89.10
Auf Lager
SKU
702QA1402KT
Stock 1 Verfügbar
Geliefert zwischen Mi., 28.01.2026 und Do., 29.01.2026

Details

This research was embarked upon in order to evaluate the existing performance indices of the 132 kV transmission line and provide useful information for the planning of the daily operations of Akure district distribution network. Descriptive statistics of the half-hourly power data for 12 months were evaluated in order to obtain half-hourly and daily maximum and minimum values. The daily load curve for each month of the study year was developed and power flow calculations were carried out using the method of Sequential Approximations. Furthermore, hourly load demand and the annual average costumer population data were obtained from the Akure end of the transmission line for a period of 60 months. The electric power outage data was used to compute the failure rate and the mean time between failures (MTBF) for each of the five years. A regression equation describing the failure rates, a formula for computing the amount of kilowatt of energy lost for each year and the customer oriented interruption indices were determined. The capacities of the system elements in the proposed substation were appropriately sized and a substation circuit diagram was designed.

Autorentext

Published Power Systems Engineer with an upward of 12 years' practical experience registered with COREN. Acquired a B.Eng (Electrical Engineering) in 2006 and an M.Eng (Power Systems) in 2011. Proficient in specialty software application and enjoys developing protocols. Significant technical accomplishments are viewable at www.nouveaudeluxe.com.

Weitere Informationen

  • Allgemeine Informationen
    • GTIN 09786134996211
    • Genre Elektrotechnik
    • Sprache Englisch
    • Anzahl Seiten 160
    • Größe H220mm x B150mm x T11mm
    • Jahr 2018
    • EAN 9786134996211
    • Format Kartonierter Einband
    • ISBN 6134996211
    • Veröffentlichung 05.11.2018
    • Titel Assessment of the Operations of Osogbo-Akure 132 kV Transmission Line
    • Autor Adewumi Adeloye
    • Untertitel A transmission line in the Nigerian Southwestern Grid is characterized and evaluated from multiple scientific dimensions
    • Gewicht 256g
    • Herausgeber LAP LAMBERT Academic Publishing

Bewertungen

Schreiben Sie eine Bewertung
Nur registrierte Benutzer können Bewertungen schreiben. Bitte loggen Sie sich ein oder erstellen Sie ein Konto.
Made with ♥ in Switzerland | ©2025 Avento by Gametime AG
Gametime AG | Hohlstrasse 216 | 8004 Zürich | Schweiz | UID: CHE-112.967.470
Kundenservice: customerservice@avento.shop | Tel: +41 44 248 38 38