Determining, Monitoring of Contingency Sum for Building Works in Ghana

CHF 61.70
Auf Lager
SKU
6FDMN5NPBMQ
Stock 1 Verfügbar
Geliefert zwischen Mi., 12.11.2025 und Do., 13.11.2025

Details

Risk management is a major concern in the building industry.Poor management of risk has resulted in delays and some cases litigation.Several strategies have been adopted for managing risk,Contingency Sum is one strategy.Study was to identify existing methods,factors,management and propose guidelines for determining and monitoring Contingency Sum. Random sampling was used for the sample size for professionals,using Kish formula.250 questionnaires were administered and 53.2% were returned.Data collected were analysed using the relative important index(4-most important factor and 1 least important ranking).Kendall's co-efficient of concordance was used to measure the degree of agreement among the professionals.Study identified percentage method as the most widely used.Unexpected ground conditions,design consideration and inflation were the influential factors.Contingency Sums were mainly monitored by Project Managers.Study concludes by proposing a method for determining contingency sum,suggests the use of a more scientific methods like Estimating Using Risk Analysis or the Monte Carlo Simulation. An over site body should set up to monitor the use of Contingency Sum.

Autorentext

Mr. Richard Oduro Asamoah is a research scientist at the Building and Road Research Institute.He has M.Sc.Construction Management (2009) B.Sc. Building Technology (2000)from Kwame Nkrumah University of Science and Technology, Kumasi. He has 10 years experience as a Research Scientist /quantity surveyor in the field of Construction Management.

Weitere Informationen

  • Allgemeine Informationen
    • GTIN 09783639224450
    • Genre Elektrotechnik
    • Sprache Englisch
    • Anzahl Seiten 120
    • Größe H220mm x B150mm x T7mm
    • Jahr 2011
    • EAN 9783639224450
    • Format Kartonierter Einband (Kt)
    • ISBN 978-3-639-22445-0
    • Titel Determining, Monitoring of Contingency Sum for Building Works in Ghana
    • Autor Richard Oduro Asamoah
    • Untertitel Existing Methods of Determining Project Contingency Sum Monitoring of Contingency Sum Factors Influencing Contingency Sum Proposed method
    • Gewicht 195g
    • Herausgeber VDM Verlag

Bewertungen

Schreiben Sie eine Bewertung
Nur registrierte Benutzer können Bewertungen schreiben. Bitte loggen Sie sich ein oder erstellen Sie ein Konto.
Made with ♥ in Switzerland | ©2025 Avento by Gametime AG
Gametime AG | Hohlstrasse 216 | 8004 Zürich | Schweiz | UID: CHE-112.967.470