Earned Value Management in Construction Project

CHF 37.35
Auf Lager
SKU
4E9VIK4CG0Q
Stock 1 Verfügbar
Geliefert zwischen Fr., 27.03.2026 und Mo., 30.03.2026

Details

There are many potential measures of performance for evaluating the success of a construction project. All address performance in three key areas: scope, schedule and budget. Earned Value Management addresses many project management areas including project organizing, planning, scheduling and budgeting, accounting, analyzing, reporting and controlling. This book explained the introduce a new and alternative approach of using a neural network for earned value management of the infrastructure project, is the best indicator of future performance by using follow-up method, and therefore, it is possible to forecast cost or schedule overruns at quite an early stage in a construction project. The objective of this book is to demonstrate that Earned Value Management is an effective management technique that integrates technical performance requirements, resource planning, with schedules and cost. The major objectives of applying earned value are to encourage the project managers and contractors to use effective technical, cost and schedule management control systems.

Autorentext

1)Dr.Faiq Mohammed Sarhan AlzwainyAssistant Professor of Construction Management, Dept. of Civil Engineering, Alnahrain University,Iraq2)Dr.Ibrahim Abed MohammedAssistant Professor of Construction Management, Dept. of Building and Construction, University of Technology, Iraq3)Duha SameerM.Sc. Student,University of Technology

Weitere Informationen

  • Allgemeine Informationen
    • GTIN 09783659750786
    • Anzahl Seiten 140
    • Genre Software
    • Sprache Englisch
    • Herausgeber LAP Lambert Academic Publishing
    • Gewicht 227g
    • Größe H220mm x B150mm x T9mm
    • Jahr 2015
    • EAN 9783659750786
    • Format Kartonierter Einband
    • ISBN 3659750786
    • Veröffentlichung 14.08.2015
    • Titel Earned Value Management in Construction Project
    • Autor Faiq M. Sarhan Alzwainy , Ibrahim A. Mohammed , Duha S. Mohsen

Bewertungen

Schreiben Sie eine Bewertung
Nur registrierte Benutzer können Bewertungen schreiben. Bitte loggen Sie sich ein oder erstellen Sie ein Konto.
Made with ♥ in Switzerland | ©2025 Avento by Gametime AG
Gametime AG | Hohlstrasse 216 | 8004 Zürich | Schweiz | UID: CHE-112.967.470
Kundenservice: customerservice@avento.shop | Tel: +41 44 248 38 38