Flowshop Scheduling Problems On Makespan Criterion By Heuristic Models

CHF 61.55
Auf Lager
SKU
EAJ327B12PI
Stock 1 Verfügbar
Geliefert zwischen Mi., 26.11.2025 und Do., 27.11.2025

Details

Global competition has engendered a trend among companies towards continuously improving operations so that they can provide customers the right products in the right quantities at the right times. In modern manufacturing, the trend is the development of Computer Integrated Manufacturing, CIM technologies which is a computerized integration of manufacturing activities (Design, Planning, Scheduling and Control) produces right products at right time to react quickly to the global competitive market demands. The productivity of CIM is highly depending upon the scheduling of Flexible Manufacturing System, FMS. Shorting the make span leads to decreasing machines idle time which results improvement in CIM productivity. Conventional methods of solving scheduling problems based on priority rules still result schedules, sometimes, with significant idle times. To optimize these, this book model the problem of a flowshop scheduling with the objective of minimizing the make span. The work proposed here deal with the Production Planning Problem, PPP of a FMS. PG-Engineering students and Engineers will find this book beneficial as a source material to solve Production Planning Problem of a FMS.

Autorentext

Ajay Kumar Agarwal, received his B.Tech. and M.Tech. in Mechanical Engineering from Kurukshetra University, Kurukshetra(Haryana) & M.B.U, Solan(Himachal Pradesh) in 2005 and 2012 respectively, and his MBA in OB&HRM from G.J.U, Hisar(Haryana) in 2008. He has published 2 Research papers in reputed International Journals and few ones are in pipeline.

Weitere Informationen

  • Allgemeine Informationen
    • GTIN 09783659330063
    • Sprache Englisch
    • Genre Allgemeines & Lexika
    • Größe H220mm x B220mm x T150mm
    • Jahr 2013
    • EAN 9783659330063
    • Format Kartonierter Einband (Kt)
    • ISBN 978-3-659-33006-3
    • Titel Flowshop Scheduling Problems On Makespan Criterion By Heuristic Models
    • Autor Ajay Kumar Agarwal
    • Herausgeber LAP Lambert Academic Publishing
    • Anzahl Seiten 116

Bewertungen

Schreiben Sie eine Bewertung
Nur registrierte Benutzer können Bewertungen schreiben. Bitte loggen Sie sich ein oder erstellen Sie ein Konto.
Made with ♥ in Switzerland | ©2025 Avento by Gametime AG
Gametime AG | Hohlstrasse 216 | 8004 Zürich | Schweiz | UID: CHE-112.967.470