Force Majeure in the Hydropower Industry

CHF 69.15
Auf Lager
SKU
3D3R1LIFUCC
Stock 1 Verfügbar
Geliefert zwischen Mi., 26.11.2025 und Do., 27.11.2025

Details

Presented with the Award of the Senate of the University of Bucharest for the most prestigious book in the field of Life and Earth Sciences, 2022-2023.This book aims to highlight the particular situation faced by certain hydropower companies by the fact that they cannot fulfil their contracts due to force majeure. The first part of this book will be an analysis of how water is used in electricity production. It is important to point out that all types of energy sources use water, to a different extent, of course, and that its spatial and temporal availability is very important. The focus will be on hydropower, presenting the current situation at the global level, and the effect of reducing the amounts of water in the river system.The second part is based on the presentation of the concept of force majeure and the ways of presenting and drafting it in a contract. Many disputes or the success of a contract depended heavily on the provisions of this article of the contract. Obviously, there are also situations in which the signatory parties abuse or are not protected by these provisions of force majeure. Starting from a few brief examples from the international level, we reach a wide discussion of the situation created in Romania, when the largest supplier of electricity produced on the basis of water terminates several contracts invoking force majeure. The manner in which the opinion of the parties involved is presented to the court is analyzed and presented in detail.

Presents up-to-date information on the concept of Force Majeure Insights into the evolution of water resources climate change and societal needs International case studies and examples of Force Majeure invocation

Autorentext

Daniel Constantin Diaconu is an Assistant Professor of the Faculty of Geography, University of Bucharest. He holds a Master degree in water resources and obtained a PhD in Geography.


Inhalt
Chapter 1 Introduction.- Chapter 2 Water for energy versus energy for water.- Chapter 3. Energy sectors that use water.- Chapter 4. The context of the development of the World hydropower sector.- Chapter 5. The impact of drought on the hydropower domain.- Chapter 6. Force majeure.- Chapter 7. Sample contractual provisions, which must be contained in a force majeure contract.- Chapter 8. Concrete cases of invocation of force majeure.- Chapter 9. Romania, in a European energy context.- Chapter 10. Settlement of the dispute, in case the force majeure clause is invoked by Hidroelectrica SA.- Chapter 11. Electricity, systemic crises and environmental policies.

Weitere Informationen

  • Allgemeine Informationen
    • Sprache Englisch
    • Herausgeber Springer International Publishing
    • Gewicht 265g
    • Untertitel Concepts and Case Studies
    • Autor Daniel Constantin Diaconu
    • Titel Force Majeure in the Hydropower Industry
    • Veröffentlichung 23.03.2023
    • ISBN 3031274016
    • Format Kartonierter Einband
    • EAN 9783031274015
    • Jahr 2023
    • Größe H235mm x B155mm x T10mm
    • Anzahl Seiten 168
    • Lesemotiv Verstehen
    • Auflage 1st edition 2023
    • GTIN 09783031274015

Bewertungen

Schreiben Sie eine Bewertung
Nur registrierte Benutzer können Bewertungen schreiben. Bitte loggen Sie sich ein oder erstellen Sie ein Konto.
Made with ♥ in Switzerland | ©2025 Avento by Gametime AG
Gametime AG | Hohlstrasse 216 | 8004 Zürich | Schweiz | UID: CHE-112.967.470