How Megaprojects Are Damaging Nigeria and How to Fix It

CHF 58.05
Auf Lager
SKU
SN1FD2RB6FT
Stock 1 Verfügbar
Geliefert zwischen Mi., 28.01.2026 und Do., 29.01.2026

Details

Since 1960, two-thirds of very large governmental projects in Nigeria have not only failed, but been abandoned mid-course. This presents a bigger failure rate than mega projects elsewhere, and yet there is no available data or analysis to help us understand the reasons behind such failures. This book provides an authoritative examination into why very large projects in Nigeria have failed so badly, and provides practical recommendations on how the Nigerian government can improve its project performance.

Drawing on data from 38 very large projects (19 completed and 19 abandoned) with a total budget of over $25B, this book presents detailed analysis of these projects and in-depth case studies 11 of the projects, and presents lessons for improvement. Through this, the authors have identified a small number of key success drivers, and argue that making moderate improvements on any of them would, on average, save hundreds of millions of dollars on one large project alone.

This book is a game-changer in the management of government mega projects in Nigeria. With clear implications for other developing economies, this is a vital resource for project management practitioners, executives and civil servants.

This is an open access book.

First book on very large projects in Nigeria, with a clear analysis of systemic weaknesses and recommendations In-depth case studies offer a real life insight into what success drivers look like in context Draws on three other countries to show how they have improved their government project management practices This book is open access, which means that you have free and unlimited access

Autorentext

Jimoh Ibrahim is a prominent businessman in Nigeria, with business interests in hotels, insurance, banking, oil and gas, real estate, and airlines. He is also currently completing his Business Doctorate degree at the University of Cambridge Judge Business School. He holds a Bachelor's degree in law and a Master of Public Administration from the Obafemi Awolowo University Ile Ife, Nigeria, in addition to a Master of Science in Mega Project Management from the University of Oxford Said Business School, and a Master of Business Administration from the University of Cambridge. He is also an alumnus of the Harvard Law School and holds other degrees.

In the public sector, Jimoh Ibrahim was in 2005 appointed as the Honorary Consul of the Democratic Republic of Sao Tome and Principe to the Federal Republic of Nigeria for life in 2007. He was appointed by the President of the Federal Republic of Nigeria as the Chairman of the Board of Directors of the Nigeria Corporate Affairs Commission (equivalent of the British Company House). In addition, the president of Nigeria conferred on him the higher National Honours of "Officer of the order of the Federal Republic" OFR and "Commander of the Order of Federal Republic" CFR (the equivalent of the British Knight Commander of the Most Excellent Order of the British Empire CBE). Ibrahim is currently working on establishing a new University in Nigeria.

Christoph Loch is Professor of Operations and Technology Management at the Cambridge Judge Business School. He served as the Dean of the school from 2011 to 2021, in which period the school grew from M to M in annual revenues and rose in Financial Times rankings into the global top 20. Professor Loch is globally known for research on innovation, operations management, and project management, and he has received a research award from the Project Management Institute (PMI). He is a well-known speaker and instructor on innovation and on project management. He has written a previous book on project management in addition to books on innovation and management quality in manufacturing.

Kishore Sengupta is Professor of Operations and Technology Management at the Cambridge Judge Business School. He is an internationally known researcher on project management, and he is the programme director of the project management executive education offering at the Cambridge Judge Business School.


Inhalt

1 Introduction: The Project Abandonment Problem.- References.- 2 What We Know About the Management of Very Large Projects.- 2.1 Project Success Factors as Lists.- 2.2 The Project Success Frameworks of Miller and Lessard and Morris and Hough.- 2.2.1 Miller and Lessard (2000).- 2.2.2 Morris and Hough (1987).- 2.3 The Nigerian Context.- 2.4 The Extended Theoretical Framework.- 2.5 What About Corruption?.- References.- 3 Structure of the Investigation.- 3.1 Overview of the Approach Taken in This Study.- 3.2 Construction and Execution of the Survey.- 3.3 Construction of the Sample of Projects.- 3.4 Construction of the Case Studies.- Appendix: Full Questionnaire as It Was Administered.- Our Request.- Project Variables.- References.- 4 A Description of the 38 Matched Projects.- 4.1 Lagos-Ibadan Express Road.- 4.2 Lagos-Badagry Express Road.- 4.3 Third Mainland Bridge.- 4.4 Second Niger Bridge.- 4.5 Egbin Power Station.- 4.6 Calabar Power Station.- 4.7 Zungeru Hydropower Plant.- 4.8 Delta State (Oghareki) Power Plant.- 4.9 Shiroro Hydroelectric Power Station.- 4.10 Omoku Power Plant Station.- 4.11 Mambilla Hydroelectric Power.- 4.12 Ajaokuta Steel Project.- 4.13 Kanji Dam.- 4.14 Otukpo Dam.- 4.15 Nigeria Satellite 2.- 4.16 Nigeria Satellite 1.- 4.17 Airtel Nigeria.- 4.18 Nigerian Telecommunications Limited (NITEL).- 4.19 Godswill Akpabio International Stadium.- 4.20 (Samuel) Ogbemudia Stadium.- 4.21 Abuja International Airport.- 4.22 Lagos MMA2 Airport.- 4.23 Yenagoa International Cargo Airport.- 4.24 Jigawa Airport Project.- 4.25 Tin Can Island Port.- 4.26 Calabar Seaport.- 4.27 Victoria Garden City (VGC) Housing Estate.- 4.28 Festac Town Federal Housing Estate.- 4.29 1004 Housing Estate.- 4.30 Abuja Mass Federal Housing Project.- 4.31 Olusegun Obasanjo Presidential Library.- 4.32 Abuja National Library.- 4.33 Nigerian Youth Empowerment Scheme (N-Power).- 4.34 Nigeria Subsidy Reinvestment and Empowerment Programme (SURE-P).- 4.35 Lagos State Waste Management Authority (LAWMA).- 4.36 Cleaner Lagos Initiative (Visionscape).- 4.37 University College Teaching Hospital (UCH) Ibadan.- 4.38 University of Abuja Teaching Hospital (UATH).- References.- 5 Insights from the Analysis of the Questionnaires.- 5.1 Variable Distributions and Variable Capability to Detect Differences Across Projects.- 5.1.1 Each Respondent Type Adds Unique Perspectives and Information.- 5.1.2 The Variables Capture Robust Differences Between Abandoned and Completed Projects.- 5.2 Condensing Variables into Aggregated Success Factors .- ** 5.2.1 Approach.- 5.2.2 Identifying the Factors.- 5.3 Econometric Prediction of Project Completion.- 5.4 Econometric Prediction of Cost and Schedule Overruns for Completed Projects.- 5.4.1 Effect of Variables on Budget Overruns.- 5.4.2 Effect of Variables on Schedule Overruns.- 5.5 The Corrosive Effect of Corruption.- Appendix 1 Correlations Among Independent Variables Across All 114 Responses.- Appendix 2 Factor Analysis.- Appendix 3 Specification of the Logistical Regression.- Appendix 4 The Logistical Completion Probability Regression by Respondent Group.- Appendix 5 Robustness Analysis: Cost Overrun Regressions by Respondent Group.- Appendix 6 Robustness Analysis: Schedule Overrun Regressions by Respondent Group.- 6 Two Library Projects.- 6.1 The National Library of Nigeria in Abuja: An Abandoned Project.- 6.1.1 Project Initiation.- 6.1.2 Contract Signature and Execution.- 6.1.3 Conclusion.- 6.2 Olusegun Obasanjo Presidential Library: A Completed Project.- 6.2.1 Project Initiation.- 6.2.2 Project Execution and Outcome.- 6.2.3 The Difference Between the Two Projects: In the Words of Former President Obasanjo.- References.- 7 Two Bridge Projects.- 7.1 The Second Niger Bridge: A Stalled Project.- 7.1.1 Project Initiation.- 7.1.2 Contract Disputes and Recontracting.- 7.1.3 Continued Stalling.- 7.1.4 Diagnosis …

Weitere Informationen

  • Allgemeine Informationen
    • GTIN 09783030964764
    • Auflage 1st ed. 2022
    • Sprache Englisch
    • Genre Economy
    • Lesemotiv Verstehen
    • Größe H14mm x B155mm x T235mm
    • Jahr 2022
    • EAN 9783030964764
    • Format Kartonierter Einband
    • ISBN 978-3-030-96476-4
    • Titel How Megaprojects Are Damaging Nigeria and How to Fix It
    • Autor Jimoh Ibrahim , Christoph Loch , Kishore Sengupta
    • Untertitel A Practical Guide to Mastering Very Large Government Projects
    • Herausgeber Springer International Publishing
    • Anzahl Seiten 240

Bewertungen

Schreiben Sie eine Bewertung
Nur registrierte Benutzer können Bewertungen schreiben. Bitte loggen Sie sich ein oder erstellen Sie ein Konto.
Made with ♥ in Switzerland | ©2025 Avento by Gametime AG
Gametime AG | Hohlstrasse 216 | 8004 Zürich | Schweiz | UID: CHE-112.967.470
Kundenservice: customerservice@avento.shop | Tel: +41 44 248 38 38