Implementing Lean Construction using the Last Planner System in Iraq

CHF 70.35
Auf Lager
SKU
EBE7MMECDV7
Stock 1 Verfügbar
Geliefert zwischen Di., 11.11.2025 und Mi., 12.11.2025

Details

One important improvement initiative, with direct practical impacts, has been the adoption of Lean Construction (LC). The best known LC technique is the Last Planner System (LPS), which has been demonstrated as a very useful tool for the management of the construction process and the continuous monitoring of planning efficiency.Nowadays, in Northern Iraq the increased economic growth as well as urbanization in developing cities has led into extensive construction activities that generate large amounts of wastes. Wastes in construction projects resulted into huge financial setbacks to builders and contractors. In addition to this, it may also cause significant effects over aesthetics, health, and the general environment.

Autorentext

Twana Othman M. Amin holds a B.Sc. and a M.Sc. in Civil Engineering from Eastern Mediterranean University, North Cyprus. The author works and lives in Kurdistan Region of Iraq.

Weitere Informationen

  • Allgemeine Informationen
    • GTIN 09786202198103
    • Genre Art
    • Anzahl Seiten 128
    • Herausgeber LAP LAMBERT Academic Publishing
    • Größe H220mm x B150mm x T9mm
    • Jahr 2017
    • EAN 9786202198103
    • Format Kartonierter Einband
    • ISBN 6202198109
    • Veröffentlichung 12.12.2017
    • Titel Implementing Lean Construction using the Last Planner System in Iraq
    • Autor Twana Amin
    • Gewicht 209g
    • Sprache Englisch

Bewertungen

Schreiben Sie eine Bewertung
Nur registrierte Benutzer können Bewertungen schreiben. Bitte loggen Sie sich ein oder erstellen Sie ein Konto.
Made with ♥ in Switzerland | ©2025 Avento by Gametime AG
Gametime AG | Hohlstrasse 216 | 8004 Zürich | Schweiz | UID: CHE-112.967.470