Wir verwenden Cookies und Analyse-Tools, um die Nutzerfreundlichkeit der Internet-Seite zu verbessern und für Marketingzwecke. Wenn Sie fortfahren, diese Seite zu verwenden, nehmen wir an, dass Sie damit einverstanden sind. Zur Datenschutzerklärung.
Multi-Stage Simultaneous Lot-Sizing and Scheduling
Details
In the consumer packaged goods industry, usually a large number of final items are produced in a highly automated flow line production system. Florian Seeanner presents a mathematical model which is an improved version of the General Lot-Sizing and Scheduling Problem for Multiple production Stages (GLSPMS) to tackle the problem of shifting bottlenecks. Especially, a new meta-heuristic is developed which combines the principles of Variable Neighborhood Decomposition Search (VNDS) and Exchange. This VNDS+E heuristic is able to find very good solutions for the improved GLSPMS, including a real-world problem case. Finally, further model extensions, e.g., for scarce setup resources, are proposed.
Publication in the field of economic sciences Includes supplementary material: sn.pub/extras
Autorentext
Dr. Florian Seeanner wrote his dissertation under Prof. Dr. Herbert Meyr's supervision at the Chair of Production and Supply Chain Management at the Technische .Universität Darmstadt
Inhalt
Simultaneous Lot-Sizing and Scheduling for flowline production systems.- General Lot-Sizing and Scheduling Problem for Multiple production Stages.- Model reformulation & Heuristics.
Weitere Informationen
- Allgemeine Informationen
- GTIN 09783658020880
- Auflage 2013
- Sprache Englisch
- Genre Allgemeines & Lexika
- Lesemotiv Verstehen
- Größe H210mm x B148mm x T12mm
- Jahr 2013
- EAN 9783658020880
- Format Kartonierter Einband
- ISBN 3658020881
- Veröffentlichung 29.05.2013
- Titel Multi-Stage Simultaneous Lot-Sizing and Scheduling
- Autor Florian Seeanner
- Untertitel Planning of Flow Lines with Shifting Bottlenecks
- Gewicht 276g
- Herausgeber Springer Fachmedien Wiesbaden
- Anzahl Seiten 208