Pennsylvania Canal Tunnel

CHF 39.65
Auf Lager
SKU
93M9P742TBD
Stock 1 Verfügbar
Geliefert zwischen Mi., 29.04.2026 und Do., 30.04.2026

Details

The Pennsylvania Canal Tunnel was the Pittsburgh terminus of the Pennsylvania Main Line of Public Works, a transportation system that involved other early tunnels. Construction was authorized February 8, 1827, and the tunnel was completed November 10, 1829. The canal crossed the Allegheny River on a covered bridge aqueduct, later replaced by John A. Roebling's first suspension bridge, the Allegheny Aqueduct., the canal traveled underground through most of downtown Pittsburgh, under Grant's Hill, to end in a lock leading to the Monongahela River.

Weitere Informationen

  • Allgemeine Informationen
    • GTIN 09786137878033
    • Auflage Aufl.
    • Editor Bartholomei Timotheos Crispinus
    • Sprache Englisch
    • Genre Technik
    • Größe H220mm x B220mm
    • Jahr 2011
    • EAN 9786137878033
    • Format Kartonierter Einband (Kt)
    • ISBN 978-613-7-87803-3
    • Titel Pennsylvania Canal Tunnel
    • Untertitel Main Line of Public Works, Allegheny River
    • Herausgeber Betascript Publishing
    • Anzahl Seiten 116

Bewertungen

Schreiben Sie eine Bewertung
Nur registrierte Benutzer können Bewertungen schreiben. Bitte loggen Sie sich ein oder erstellen Sie ein Konto.
Made with ♥ in Switzerland | ©2025 Avento by Gametime AG
Gametime AG | Hohlstrasse 216 | 8004 Zürich | Schweiz | UID: CHE-112.967.470
Kundenservice: customerservice@avento.shop | Tel: +41 44 248 38 38