Planning and Design of Hydro Electric Power Project

CHF 57.55
Auf Lager
SKU
IQ0298I559V
Stock 1 Verfügbar
Geliefert zwischen Mi., 26.11.2025 und Do., 27.11.2025

Details

Fundamentals of hydraulics and hydrology are used to present the basic theory necessary to understand hydropower engineering. The proposed hydel scheme lies on Upper Chenab Canal Lower at RD 283 using the available discharge data of UCC for past ten years, daily flow duration curve, hydrograph and rating curve are developed which are used to analyze and select suitable pattern for power generation. The proposed layout of the study recommended is conventional powerhouse with a spillway discharge downstream of RD 283. The procedures presented fill a need for an authoritative technique to help in the design and environmental aspects of planning for potential projects. Estimated total cost of the project is Rs. 219.509 million inclusive of Rs. 62.600 million as foreign exchange compared. Internal rate of return in case of this study is 32.95% Comparison of the results with equivalent diesel generation shows the economic viability of the project. Project is relatively marginal and very small in terms of energy contribution yet it is commended for implementation in view of acute shortage of electricity in the country at present.

Autorentext

Ph.D in Water Resources Engineering, M.Sc in Hydro-power Engineering and B.Sc in Civil Engineering from CEWRE-UETL Pakistan. He has experiences in water projects and their relation with poverty alleviation and environment. He is Assistant Professor in Department of Civil Engineering, Sarvestan Branch, Islamic Azad University, Sarvestan, Iran.

Weitere Informationen

  • Allgemeine Informationen
    • GTIN 09783659107238
    • Sprache Englisch
    • Auflage Aufl.
    • Größe H220mm x B150mm x T6mm
    • Jahr 2012
    • EAN 9783659107238
    • Format Kartonierter Einband
    • ISBN 3659107239
    • Veröffentlichung 03.05.2012
    • Titel Planning and Design of Hydro Electric Power Project
    • Autor Ali Asghar Irajpoor
    • Untertitel A case study of proposed low head hydropower plant at upper Chenab canal
    • Gewicht 161g
    • Herausgeber LAP LAMBERT Academic Publishing
    • Anzahl Seiten 96
    • Genre Sozialwissenschaften, Recht & Wirtschaft

Bewertungen

Schreiben Sie eine Bewertung
Nur registrierte Benutzer können Bewertungen schreiben. Bitte loggen Sie sich ein oder erstellen Sie ein Konto.
Made with ♥ in Switzerland | ©2025 Avento by Gametime AG
Gametime AG | Hohlstrasse 216 | 8004 Zürich | Schweiz | UID: CHE-112.967.470