RCM: Railway Transit Maintenance to Achieve Optimal Performance

CHF 78.35
Auf Lager
SKU
85F3VRH8CRH
Stock 1 Verfügbar
Geliefert zwischen Mi., 24.12.2025 und Do., 25.12.2025

Details

The purpose of this qualitative case study was to identify the types of obstacles and patterns experienced by a single heavy rail transit agency located in North America that embedded a Reliability Centered Maintenance (RCM) Process. The outcome of the RCM process also examined the impact of RCM on availability, reliability, and safety of rolling stock. This qualitative study interviewed managers (10 cases), and non-managers (10 cases) at the transit agency obtain data. The data may serve to help rail transit leaders determine future strategic directions that would improve this industry. The research method for the first portion of this qualitative case study was to collect data from subjects by administering an open- ended, in-depth personal interview, of manager and non-managers. The second portion of the study explored how the RCM process affected rolling stock for availability, reliability, and safety. The second portion of the study used data derived from project documents and reports (such as progress reports, e-mail, and other forms of documentation) to answer questions about the phenomena.

Autorentext

For more than 20 years Dr. Marten has been employed with the San Francisco Bay Area Rapid Transit District (BART), his team completed and opened the San Francisco Airport Extension. He currently holds the position of Assistant Superintendent, of System Maintenance.

Weitere Informationen

  • Allgemeine Informationen
    • GTIN 09783838389806
    • Sprache Englisch
    • Titel RCM: Railway Transit Maintenance to Achieve Optimal Performance
    • Veröffentlichung 18.08.2010
    • ISBN 3838389808
    • Format Kartonierter Einband
    • EAN 9783838389806
    • Jahr 2010
    • Größe H220mm x B150mm x T12mm
    • Autor Felix Marten
    • Untertitel Reliability Centered Maintenance: A Case Study of Railway Transit Maintenance To Achieve Optimal Performance
    • Genre Management
    • Anzahl Seiten 188
    • Herausgeber LAP LAMBERT Academic Publishing
    • Gewicht 298g

Bewertungen

Schreiben Sie eine Bewertung
Nur registrierte Benutzer können Bewertungen schreiben. Bitte loggen Sie sich ein oder erstellen Sie ein Konto.
Made with ♥ in Switzerland | ©2025 Avento by Gametime AG
Gametime AG | Hohlstrasse 216 | 8004 Zürich | Schweiz | UID: CHE-112.967.470