Reverse Engineering on Process Cycle Time in a Medium Scale Industry

CHF 47.55
Auf Lager
SKU
FAESICMQDVT
Stock 1 Verfügbar
Geliefert zwischen Do., 15.01.2026 und Fr., 16.01.2026

Details

Make a Production Schedule. Crew Up. Visualize your project's "Look". Find and secure Locations. Casting. Production Design (questions to ask yourself). Prepare costumes, props, set dressing. QUESTIONS TO ASK YOURSELF WHEN DEVELOPING A SHOOTING SCRIPT FOR YOUR PRODUCTION PLAN AND CONTROL. Make a Floorplan / lighting plot for each Location. Make a Storyboard for your Production Plan and Control. Make a Planned Production Schedule. Make Cross-check areas for planned areas of Planned Production Schedule for effectiveness planning of that planned Schedule. Compare new results with the existing results based upon Planning Schedule of both times.

Autorentext

Ajay Kumar Agarwal - Er promoviert. 2005, 2008 und 2012 erhielt er seinen B.Tech., M.B.A & M.Tech. in ME, OB & HRD und ME von K.U.K, G.J.U, Hisar (Haryana) und M.B.U, Solan (H.P.). Er spielt eine wichtige Rolle bei der Organisation, Verwaltung und Betreuung von ME-Studenten, IMRCP von ME-Laboren, Workshops, Seminaren, FDP, Konferenzen und Forschungsarbeiten einer ME-Abteilung.


Klappentext

Make a Production Schedule. Crew Up. Visualize your project s Look . Find and secure Locations. Casting. Production Design (questions to ask yourself). Prepare costumes, props, set dressing. QUESTIONS TO ASK YOURSELF WHEN DEVELOPING A SHOOTING SCRIPT FOR YOUR PRODUCTION PLAN AND CONTROL. Make a Floorplan / lighting plot for each Location. Make a Storyboard for your Production Plan and Control. Make a Planned Production Schedule. Make Cross-check areas for planned areas of Planned Production Schedule for effectiveness planning of that planned Schedule. Compare new results with the existing results based upon Planning Schedule of both times.

Weitere Informationen

  • Allgemeine Informationen
    • GTIN 09786139859184
    • Sprache Englisch
    • Genre Maschinenbau
    • Anzahl Seiten 84
    • Größe H220mm x B150mm x T6mm
    • Jahr 2018
    • EAN 9786139859184
    • Format Kartonierter Einband
    • ISBN 6139859182
    • Veröffentlichung 06.07.2018
    • Titel Reverse Engineering on Process Cycle Time in a Medium Scale Industry
    • Autor Ajay Kumar Agarwal
    • Gewicht 143g
    • Herausgeber LAP LAMBERT Academic Publishing

Bewertungen

Schreiben Sie eine Bewertung
Nur registrierte Benutzer können Bewertungen schreiben. Bitte loggen Sie sich ein oder erstellen Sie ein Konto.
Made with ♥ in Switzerland | ©2025 Avento by Gametime AG
Gametime AG | Hohlstrasse 216 | 8004 Zürich | Schweiz | UID: CHE-112.967.470