Wir verwenden Cookies und Analyse-Tools, um die Nutzerfreundlichkeit der Internet-Seite zu verbessern und für Marketingzwecke. Wenn Sie fortfahren, diese Seite zu verwenden, nehmen wir an, dass Sie damit einverstanden sind. Zur Datenschutzerklärung.
SELECTION AND CALCULATION OF PARAMETERS DEVELOPMENT SYSTEM
Details
Course project is provided by the program of discipline "Technology of open pit mining" for students of directions 60721500 - "Mining Engineering (by branches)".The course project considers the issues of deepening system of development with longitudinal preparation of pit ledges for inclined and steeply falling ore deposits of a layer-shaped form, occurring in the thickness of rocky rocks and having as covering rocks moraine deposits. The methodology provides for excavation of rock mass by an excavator of ECG type with road transportation.The final goal of the work is to calculate the parameters of the development system, the productivity of the open pit for ore and overburden and the calculation of the fleet of excavators.Methodical instructions are considered and approved at the meeting of the department "Mining" (Minutes 11 from "25" June 2024) and recommended for publication in the open press.
Autorentext
Zaripova Firuza Bahtijarovna. Navoi State Mining and Technological University. Department of Mining Engineering. Republic of Uzbekistan.
Klappentext
Course project is provided by the program of discipline "Technology of open pit mining" for students of directions 60721500 - "Mining Engineering (by branches)".The course project considers the issues of deepening system of development with longitudinal preparation of pit ledges for inclined and steeply falling ore deposits of a layer-shaped form, occurring in the thickness of rocky rocks and having as covering rocks moraine deposits. The methodology provides for excavation of rock mass by an excavator of ECG type with road transportation.The final goal of the work is to calculate the parameters of the development system, the productivity of the open pit for ore and overburden and the calculation of the fleet of excavators.Methodical instructions are considered and approved at the meeting of the department "Mining" (Minutes 11 from "25" June 2024) and recommended for publication in the open press.
Weitere Informationen
- Allgemeine Informationen
- GTIN 09786207836758
- Genre Earth Science
- Anzahl Seiten 56
- Herausgeber Our Knowledge Publishing
- Größe H220mm x B150mm
- Jahr 2025
- EAN 9786207836758
- Format Kartonierter Einband
- ISBN 978-620-7-83675-8
- Titel SELECTION AND CALCULATION OF PARAMETERS DEVELOPMENT SYSTEM
- Autor Firuza Zaripova
- Untertitel Methodological manual.DE
- Sprache Englisch