Sentosa Express
CHF 43.05
Auf Lager
SKU
FJSE0QR7U7F
Geliefert zwischen Mi., 22.10.2025 und Do., 23.10.2025
Details
High Quality Content by WIKIPEDIA articles! Sentosa Express is a monorail line connecting Sentosa island to HarbourFront on the Singapore mainland across the waters. Built at a cost of S$140 million, development started in June 2003 and was completed in December 2006. The fully-elevated 2.1-kilometre (1.3-mile; per direction) two-way line (4.3-km total track length) and three out of four stations opened on 15 January 2007. The fourth station, Waterfront, opened on 1 February 2010. The monorail system, privately owned and operated by Sentosa Development Corporation, can move up to 4,000 passengers per hour per direction. The daily first and last train timings of both Sentosa and Beach termini are 07:00 and 00:00 hours. Trains run at an average frequency of three minutes during peak days.
Weitere Informationen
- Allgemeine Informationen
- GTIN 09786130569358
- Genre Technik
- Editor Lambert M. Surhone, Miriam T. Timpledon, Susan F. Marseken
- Anzahl Seiten 80
- Herausgeber Betascript Publishing
- EAN 9786130569358
- Format Fachbuch
- Titel Sentosa Express
Bewertungen
Schreiben Sie eine Bewertung