The Impact of Quality Management Systems During the Nuclear Project

CHF 78.35
Auf Lager
SKU
LSPKV9CP9K5
Stock 1 Verfügbar
Geliefert zwischen Fr., 21.11.2025 und Mo., 24.11.2025

Details

In the nuclear industry, Quality Management Systems are extremely important, especially if one wishes to improve public acceptance of radioactive solutions. There is normally minimum communication between the public and scientists, especially in nuclear science. People are not comfortable with nuclear technology, based on the past history of the Chernobyl catastrophe. Consequently, it is difficult to discuss important and sensitive issues like disposing of nuclear waste. Quality Management Systems can improve public confidence and communication. Integrated Management Systems in the project planning stage of the project can be a proactive step towards preventing unnecessary delays and costs. Most people believe that a Quality Management System is quality control only and forget the aspect of Quality assurance. The project managers are more concerned with finishing the project and saving costs. Quality holds together the three pillars of project management, which are schedule, costs and scope. There are a plethora of things that can go wrong if the Quality Management System is not implemented on time, like scope changes that are not captured, monitored and controlled.

Autorentext

Lwandiso L. Zamxaka, MTech Quality: Studied Electrical Engineering at Cape Peninsula University of Technology. Senior Quality Advisor at Eskom Holdings, South Africa. Member of Engineering Council of South Africa (ECSA) and South African Quality Institute (SAQI).

Weitere Informationen

  • Allgemeine Informationen
    • GTIN 09783846580790
    • Sprache Englisch
    • Titel The Impact of Quality Management Systems During the Nuclear Project
    • Veröffentlichung 30.01.2012
    • ISBN 3846580791
    • Format Kartonierter Einband
    • EAN 9783846580790
    • Jahr 2012
    • Größe H220mm x B150mm x T12mm
    • Autor Lwandiso Lindani Zamxaka
    • Untertitel Pebble Bed Modular Reactor Project: Case Study
    • Auflage Aufl.
    • Genre Management
    • Anzahl Seiten 192
    • Herausgeber LAP LAMBERT Academic Publishing
    • Gewicht 304g

Bewertungen

Schreiben Sie eine Bewertung
Nur registrierte Benutzer können Bewertungen schreiben. Bitte loggen Sie sich ein oder erstellen Sie ein Konto.
Made with ♥ in Switzerland | ©2025 Avento by Gametime AG
Gametime AG | Hohlstrasse 216 | 8004 Zürich | Schweiz | UID: CHE-112.967.470