The implementation of the Furnas Hydroelectric Power Plant (MG)

CHF 62.35
Auf Lager
SKU
4J7HC1ADHVM
Stock 1 Verfügbar
Geliefert zwischen Mi., 08.04.2026 und Do., 09.04.2026

Details

The research that gave rise to this book, in 2008, aimed to study and analyze the repercussions caused by the implementation of the Furnas Hydroelectric Power Plant, located in the southwest region of the state of Minas Gerais. The repercussions were considered to be both the processes of "de/re/territorialization", caused by the construction of the plant, and the tourist potential, which arose after the creation of the artificial lake formed by the damming of the waters.

Autorentext

Architetto urbano presso l'Università di Alfenas (UNIFENAS/MG), dottore di ricerca in Geografia presso l'Istituto di Geoscienze dell'Università Statale di Campinas (UNICAMP/SP) e professore presso la Facoltà di Architettura e Urbanistica del Centro Universitario di Formiga (UNIFOR/MG). Ricercatore sul territorio urbano contemporaneo e sul patrimonio culturale.

Weitere Informationen

  • Allgemeine Informationen
    • GTIN 09786205951903
    • Genre Humanities
    • Sprache Englisch
    • Anzahl Seiten 72
    • Herausgeber Our Knowledge Publishing
    • Größe H220mm x B220mm x T150mm
    • Jahr 2023
    • EAN 9786205951903
    • Format Kartonierter Einband
    • ISBN 978-620-5-95190-3
    • Titel The implementation of the Furnas Hydroelectric Power Plant (MG)
    • Autor Clésio Barbosa Lemos Júnior
    • Untertitel Study on its repercussions. DE

Bewertungen

Schreiben Sie eine Bewertung
Nur registrierte Benutzer können Bewertungen schreiben. Bitte loggen Sie sich ein oder erstellen Sie ein Konto.
Made with ♥ in Switzerland | ©2025 Avento by Gametime AG
Gametime AG | Hohlstrasse 216 | 8004 Zürich | Schweiz | UID: CHE-112.967.470
Kundenservice: customerservice@avento.shop | Tel: +41 44 248 38 38