Work Breakdown Structure

CHF 146.75
Auf Lager
SKU
274V3260JRD
Stock 1 Verfügbar
Geliefert zwischen Mi., 15.04.2026 und Do., 16.04.2026

Details

High Quality Content by WIKIPEDIA articles! A work breakdown structure (WBS) in project management and systems engineering, is a tool used to define and group a project's discrete work elements (or tasks) in a way that helps organize and define the total work scope of the project. A work breakdown structure element may be a product, data, a service, or any combination. A WBS also provides the necessary framework for detailed cost estimating and control along with providing guidance for schedule development and control. Additionally the WBS is a dynamic tool and can be revised and updated as needed by the project manager.

Weitere Informationen

  • Allgemeine Informationen
    • GTIN 09786130321147
    • Editor Lambert M. Surhone, Miriam T. Timpledon, Susan F. Marseken
    • Sprache Englisch
    • Größe H220mm x B150mm x T5mm
    • Jahr 2009
    • EAN 9786130321147
    • Format Fachbuch
    • ISBN 978-613-0-32114-7
    • Titel Work Breakdown Structure
    • Untertitel Project management, Systems engineering, Product (business), Data, Service (economics), Project manager, Tree structure, Statement of work, Program Evaluation and Review Technique
    • Gewicht 136g
    • Herausgeber Betascript Publishers
    • Anzahl Seiten 80
    • Genre Wirtschaft

Bewertungen

Schreiben Sie eine Bewertung
Nur registrierte Benutzer können Bewertungen schreiben. Bitte loggen Sie sich ein oder erstellen Sie ein Konto.
Made with ♥ in Switzerland | ©2025 Avento by Gametime AG
Gametime AG | Hohlstrasse 216 | 8004 Zürich | Schweiz | UID: CHE-112.967.470
Kundenservice: customerservice@avento.shop | Tel: +41 44 248 38 38